You are here

November 2017 Work Party

As part of our regular maintenance we conducted a work party on the 26th of November.

Top Loch

The day was much colder than expected however we carried out an inspection of the fishings finding everything in order. We also removed the boats for winter. This is an essential task as water accumulating in the boats through rainfall can freeze cracking or damaging the boats.

We removed all boats, drained them and located them on the banks of the lochs. The task was made slightly more difficult than expected due to the freezing conditions. However we arrived prepared and deployed our ice breaker to enable the boats to be moved.

Ice Breaker